Schedule & Gantt
The Planning Module allows you to upload your schedules into RDOWEB.
Integrated with MS Project, it reads *.mpp or Excel files and creates the task structure to be tracked in CDRs.
This way, what has been performed is automatically cross-referenced and can be easily monitored on the platform.
Integrated with MS Project
The biggest challenge in planning engineering isn't creating the schedule, but rather keeping it up to date and in line with the reality on the construction site.
The direct integration of the .mpp file with RDOWEB solves the problem of the "drawer schedule", since Planned vs Actual becomes a daily operational tool. Without this integration, the field reporter needs to fill in the RDO and the planner needs to manually type these advances into MS Project. This process generates transcription errors and loss of information. With import, the task mesh is identical in both systems, ensuring that what was planned in the office is exactly what is being measured in the field.

Planned vs. Actual
in Real Time
Automatic updates enable what we call Agile Construction Management . As soon as the CDR is closed, the impact on the critical path is calculated.