BMM Module
While the RDO (Daily Construction Report) records what happened day by day, Measurement groups this information to generate the Measurement Bulletin. Through this document, the contractor proves to the client (or subcontractor) how much work or materials should be paid at the end of the month or fortnight.
The system allows registering measurement items with their respective Unit Price (UP), such as cubic meters of concrete, square meters of painting, or tons of steel. The module tracks in the RDOs the quantity completed for each item, controlling the contract balance and preventing more than the planned total from being measured.
The security and transparency of financial information are ensured by a workflow with multiple validation and approval levels. This system also improves communication and traceability among the different people responsible for the process: the issuer, the validator, and the approver.
Automatic Notifications
Once the BM is issued, those responsible receive a PDF copy or a direct access link, speeding up verification, that is, the next step in the flow. Pending Issues and Safety Alerts: automatic notifications for serious incidents or items that require immediate occupational safety attention. Approval and Signature: automatic notices when a document awaits digital signature or when a report is rejected by inspection, allowing quick corrections. Weekly/Monthly Summary: scheduled delivery of performance indicators (KPIs) and physical progress to management.

Approval Workflow
The RDOWEB Measurement Module (BMM) enables the issuance of Measurement Bulletins in a structured and controlled manner, replacing manual processes that are more prone to errors. The flow can be adjusted to your company’s reality and the main steps are described below:
- Draft: This is the initial stage, in which the Issuer prepares the Measurement Bulletin (BM). At this stage, the document is not yet official and is still being drafted.
- Issuer - level 1: At this stage, the BM is forwarded to the next responsible person who can sign it, thus changing the status to Issued, which means it is ready to be Validated.
- Validator - level 2: The Validator reviews the BM draft, checking the data. If everything is correct, they approve it and move it to the Validated status.
- Approver - level 3: This is the final stage of the process. The Approver steps in to give final approval to the Measurement Bulletin. They review everything from a more managerial or financial perspective and, if everything is correct, sign the document, which then receives the Approved status.